Contractor Reply Check
Paste the contractor's answer before you sign.
A helpful-sounding reply is not the same as a signed quote update. Check whether the answer actually resolves scope, allowance, payment, exclusion, permit, schedule, and change-order risk.
Input
Check the reply against the written quote.
Output
Clarify before signing
The reply has enough gaps that the next move should be written clarification, not a verbal yes.
Risk score
0/100
Reply length
0 words
Quote total
not entered
Workflow
reply check
Risk language detected
Clarity language detected
Written source gaps
Operating state
What this workflow is checking.
1. Source data
Quote text, contractor reply, written scope, allowance, payment, exclusion, permit, schedule, and change-order categories.
2. State transition
Reply received, written source checked, risk scored, response drafted, then either revise the quote or order a review.
3. Audit trail
The local result stores version, risk score, selected evidence, and status in the browser so the user can repeat the check.